About 53 results
Open links in new tab
  1. Egress Capacity Calculator - 2024 IBC

    Interactive calculator for means of egress using 2024 IBC Section 1005, Table 1020.3, and Section 1010.1.1 for doors.

  2. Mini-Class: Unlocking Chapter 1 of the 2024 IBC – Scope and ...

    Oct 16, 2009 · Chapter 1 of the 2024 International Building Code (IBC) establishes the foundation for how the code is applied, enforced, and interpreted. It outlines the scope, purpose, and administrative …

  3. 1006.2.1 Egress based on occupant load and common path of egress …

    Dec 23, 2020 · 2021 IBC Section 1006.2.1 requires that two exit or exit access doorways shall be provided to any space if the design occupant load or the common path of egress travel exceeds the …

  4. Group E Occupancies Explained - IBC 305 (2024) - The Building Code …

    Oct 16, 2009 · Do you agree with the following interpretation and summary of this important section? Definition and Scope of Group E Occupancies: Group E occupancy primarily involves buildings or …

  5. 2021 IBC Canopy applicable code sections

    Oct 5, 2023 · The IBC definition of "building": [A] BUILDING. Any structure utilized or intended for supporting or sheltering any occupancy. Since this canopy doesn't appear to be an extension of the …

  6. Fire Separation Distance Between New and Existing Building with …

    Feb 7, 2024 · From the 2021 IBC Commentary: The Commentary says: Fire separation distance is the distance from the exterior wall of the building to one of the three following locations, measured …

  7. 2018 IBC 1024 Exit Passageways - The Building Code Forum

    1024.1 Exit passageways. Exit passageways serving as an exit component in a means of egress system shall comply with the requirements of this section. An exit passageway shall not be used for any …

  8. IBC Allowable Building Area Calculation - The Building Code Forum

    Apr 18, 2021 · I'm an architect who unfortunately doesn't get a lot of new commercial construction projects so it's been a while since I had to calculate allowable area. I use the NJ Edition of the 2018 …

  9. Egress through Intervening Spaces - The Building Code Forum

    Feb 17, 2022 · It was mentioned that the path cannot cross through intervening spaces. The large room is the Multipurpose/Gym. I've been making evac signs as such for a while and this is the first I've …

  10. Equipment Platforms: IBC or OSHA - The Building Code Forum

    Mar 29, 2022 · I'm trying to locate any specific language in the 2015 IBC ("code") regarding when to use OSHA for the means of egress and design of walkway/stairs that serve equipment platforms. I find it …